Pressure and Temperature Log

A log of temperatures and pressures should be taken regularly . Periodically conduct a visual inspection of the chiller to identify problems before

they reach the point of failure . As with any mechanical system, it is necessary to conduct a series of checks to the ClimaCool chiller to confirm

correct operation .

Weekly

• Review daily log from previous week

• Perform visual inspection

• Properly document all data taken

• Note any problems that may exist . Immediately plan for further

investigation . If repair is necessary, schedule for earliest possible

date .

Monthly

Extract a water sample from the evaporator . Confirm that the sample

bottle is filled to the top leaving no air in the bottle . Sample to be

tested and kept in compliance with the water quality parameters

listed in Table 1 on the water treatment page of this manual . NOTE:

Monthly records of compliance and testing are required throughout

the warranty period for warranty .

Quarterly

• Check controller operating parameters and set points

• Check refrigerant pressures and temperatures

• Check compressor amps

• Check compressor oil level

• Check and test all safeties

• Check water flow rates and pressure drops across evaporator and

condenser

• Properly document all data taken

Annual

• Isolate chiller, drain all water circuits

• Back flush all heat exchangers (use only ClimaCool

recommended de-scalers)

• Remove and clean all waterside strainers

• Perform leak test on all refrigerant circuits

• Check all interconnecting flanges for proper tightness

• Perform oil analysis on each compressor

• Check and test all refrigerant safeties for proper operation

• Check all electrical terminal connections for tightness

• Manually operate all waterside isolation valves on each module

• Check all peripheral systems for proper operation

• Check and test main controller

• Verify set points, sensors and general configuration

• Properly document all data taken

Recommended Maintenance Schedule

Daily

• A daily operational log should be kept

• Perform visually inspection

• Record entering and leaving chilled water and condenser water

temperatures and pressures

• Note any problems that may exist . Immediately plan for further

investigation . If repair is necessary, schedule for earliest possible

date .

• Properly document all data taken

Date _______

Data Log ___________________

Chiller No.

_____

Technician
___________________

Sun. Mon. Tue. Wed. Thu. Fri. Sat.

Chilled Water

Entering Temp.

Chilled Water

Leaving Temp.

Condenser Water

Entering Temp.

Condenser Water

Leaving Temp.

Chilled Water

Pressure Drop

Condenser Water

Pressure Drop

Faults: Note By

Module Number

Advertising