Mityvac MV4525 COOLING SYSTEM TEST & REFILL KIT User Manual

Page 12

Advertising
background image

Dynamic Pressure/Vacuum/Temperature Test

(Engine On)

continued

11. When testing is complete, connect the Drain Hose to the Shuttle

Valve using the quick-connect. Make sure the quick-connect
sleeve snaps forward to lock the connection (Fig. 32).

12. Place the opposite end of the Drain Hose into a container

appropriate to capture hot, pressurized coolant. Use the
Hose Clip to secure the Drain Hose in position (Fig. 33).

13. Shift the shuttle valve to the the “Open” position, allowing the

hot fluid and pressure to be expelled (Fig. 34).

14. Once all pressure is relieved, cautiously disconnect components,

clean and store them properly.
Caution: Hot fluid being expelled through the test equipment will
cause quick-connects and other metal components to become
hot. Handle such components with care, using a rag if necessary.

15. Refill the radiator or coolant bottle to the proper level, and

replace the cap.

Page Number - 12

Form 822947

Fig. 34

Fig. 33

Fig. 32

Advertising