Caution, Pvcheck – HT instruments PVCHECK User Manual

Page 18

Advertising
background image

PVCHECK

EN - 16

5.3. LOW

– SETTINGS FOR CONTINUITY TEST WITH 200MA

The purpose of this measurement is to test the continuity of protective conductors and
equipotential ones (e.g. from rod to earth and connected foreign earth) and earth rods of
SPDs on PV installations. The test must be carried out using a test current > 200mA
according to the prescriptions of IEC/EN62446 guideline

5.3.1. Instrument settings
1. Position the cursor onto LOW

 by using the arrow keys

(

,) and confirm with ENTER. The display shows the

following screen:

15/05/12 15:34:26

R P E m a x

:

1

R c a l

:

- - -

R p e

=

- - -

I t e s t

=

- - -

m A

Selection

L O W


2. Press the ENTER key. The instrument shows the

following options: Settings and Leads calibration

3. Use the arrow keys (

,) to select “Settings” and

confirm with ENTER. The instrument shows the following
screen:

15/05/12 15:34:26

R P E m a x

:

1

R c a l

:

- - -

R p e

=

- - -

I t e s t

=

- - -

m A

Leads calibration

S e t t i n g s

Selection

L O W


4. Using the arrow keys (

 , ) it is possible to set the

maximum limit value of Rpe resistance which the
instrument uses as a reference while measuring.


5. Press the SAVE key to save the settings made; the

message “Data saved” will be displayed for a few
seconds. Press the ESC/MENU key to exit without saving
and go back to the previous screen.

15/05/12 15:34:26

R P E m a x :  0 1 

S A V E t o s t o r e

Selection

L O W

CAUTION

The settings saved for max RPE also affect the settings for the Continuity test
contained in the IVCK measurement (MENU

IVCK)





Advertising