Set date and time, Get battery status, Starting a flow rate study – Badger Meter ORION Classic (CE) User Manual

Page 31

Advertising
background image

Set Date and Time

To synchronize the endpoint date and time to the date and time of the handheld, align the optical head with the endpoint

IR LED port and tap the Set Date / Time button on the Advanced screen The synchronized date and time display next to

the button

Get Battery Status

1 Align the optical head of the IR cable with the

endpoint IR LED port and tap Get Battery Status
Result: The estimated number of remaining days

of endpoint battery life displays in the field next to

the button.

2 Tap Back to return to the previous screen

Figure 39: Endpoint battery status

Starting a Flow Rate Study

A flow rate study is a week-long study that can be performed on a Migratable (or Fixed Network in mobile mode) endpoint to

report high, low and average flow rates The results can be saved for use in the reading data management software

1 With the IR cable connected to the handheld, align

the optical head with the endpoint IR LED port and

tap Start
Result: A message confirms the successful start of

the flow rate study. The study continues for one week

from the start time and date.

2 Tap Back to return to the previous screen

Figure 40: Flow rate study

Getting Flow Rate Study Results

1 At the end of a week-long flow rate study, align the optical head of the IR cable with the endpoint IR LED port

tap Get
Result: The data from the Flow Rate Study fills in the field next to the Start, Get and Save buttons.

2 Tap Save to create a file of the data for use in the reading data management software

Result: A screen displays showing the location of the saved file on the handheld.

3 Tap the Back button to return to the previous screen

ORION IR PROgRAMMINg

Page 31

April 2014

ORION® Endpoint Utility for Trimble® Ranger 3

Advertising
This manual is related to the following products: