Badger Meter ORION Classic (CE) User Manual

Page 56

Advertising
background image

5 Place the endpoint into position

NOTE:

N

Put the endpoint into its final physical

location For example, with a pit lid

installation, mount the endpoint according

to the pit lid installation instructions before

proceeding

6 Align the optical head of the IR cable with the

endpoint IR LED port and tap IR GO
Result: The software goes through a series of steps to

complete the Ping.

Figure 91: Place the endpoint

“Ping completed” displays when the communication

test is complete.

7 Tap Finish to return to the Network Communication

Test main screen

Figure 92: communication test complete

ORION NETWORk cOMMUNIcATION TEST

Page 56

April 2014

ORION® Endpoint Utility for Trimble® Ranger 3