Testing a fuse: continuity – Balboa Water Group BP 60Hz User Manual

Page 32

Advertising
background image

32

Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417, 834 b2,

Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.

4/22/13

THE PREFERRED WAY TO CHECK FOR FUSE CONTINUITY IS WITH THE

FUSES REMOVED FORM THE CIRCUIT.

TESTING A FUSE: CHECK CONTINUITY

WITH THE FUSE REMOVED

Testing a Fuse: Continuity

A FUSE WITH THE

METER READING “GOOD”

A FUSE WITH THE

METER READING “BAD”

FUSES INSTALLED IN THE SYSTEM

0.3amp (part number 21581)

3amp (part number 20600)

10amp (part number 30122)

30amp (part number 30136)

THERE ARE NO SERVICEABLE PARTS ON THE PCB,.

Advertising