Setup changes with dip switch 1 on - bp500, 1s1 6 – Balboa Water Group BP 60Hz User Manual

Page 47

Advertising
background image

47

Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417, 834 b2,

Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.

42211B

Setup Changes with DIP Switch 1 ON - BP500

As soon as Switch #1 is placed
in the ON position,
The temperature will show
“T” after it instead of F or C,
indicating the System is
in Test Mode

1

S1

6

J17
J16

J29 VAC

J28 AUX FRZ

ON

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE BEGINNING THIS PROCESS.

Know the Setup Number you want before you power up the spa and wait to power up the spa until you’re ready to change the
Setup Number.
The system must be in Test Mode, so move Switch 1 to the ON position. The Test Menu will then be available.
Power up the spa, and press any button once to Link the panel. (Note: Switch 1 can be moved to the ON position immediately
after power-up, if preferred - Danger! High Voltage will be present!)
You will have 1 minute to complete the setup change after you manually exit Priming Mode. (Once familiar with the process, the
Setup change should take less than 15 seconds.)

When the panel displays RUN PMPS PURG AIR, press any Temperature button ONCE to exit Priming Mode.
You should see “---T” where the T indicates the system is in Test Mode.

Continued on Next Page.

READY

RANGE

Note:

For complete variations of equipment configurations and setups, the latest Tech Sheet should be obtained on the

system you're working on. The information for setup changes is included here in the event you have wiring diagrams available,
and to facilitate a better understanding of how setup changes are made.

Advertising