Figure 4-8: pump-to-balancer valve dome connection – Hale CAFS Attack User Manual

Page 34

Advertising
background image

Installer Installation

34

CAFS Air Bottle Installer/Operation Guide

p/n: 029-0020-85-0

Figure 4-7: 4,500 PSI HIGH Pressure Balancing Regulator and Dome Connections

9. Plumb a 3/8”

(9.5 mm) tubing
line between the
bottom or dome
port on the balanc-
ing regulator valve
to the pump dis-
charge for water-
to-air operating
pressure balance.
(See Figure 4-8:
“Pump-to-Bal-
ancer Valve Dome
Connection.”)

Figure 4-8: Pump-to-Balancer Valve Dome Connection

Advertising