Smart-switch controller - spc (s1 and s2), Figure 4-14: smart-switch controller panel cutout, Figure 4-15: spc connector, back view – Hale CAFS Attack User Manual

Page 40

Advertising
background image

Installer Installation

40

CAFS Air Bottle Installer/Operation Guide

p/n: 029-0020-85-0

Smart-Switch Controller - SPC (S1 and S2)

For the suggested panel installation and cutout dimensions see Figure 4-
14: “Smart-Switch Controller Panel Cutout” on page 40.

Determine a location on the apparatus pump operator panel for the smart-
switch controllers (2). Consideration must be given for routing the intercon-
necting cable from the controller to the foam discharge assembly and the
high pressure transducer assembly.

Figure 4-14: Smart-Switch Controller Panel Cutout

Once the SPC controllers are mounted on the
pump operator panel, attach the 10 pin AMP
connector on the cable assembly to the back of
the controller. (See Figure 4-15: “SPC Connec-
tor, Back View.”)
Also see Figure 4-16: “Primary
CAFS Wire Harness” on page 41.

Notes: Ensure that the panel where the control
units are mounted has an adequate ground. For
stainless steel and vinyl coated panels a ground
strap, 1/2” (13 mm) wide, must be attached from
one of the four screws securing the controllers in
place to the frame of the apparatus to ensure ade-
quate grounding.

Figure 4-15: SPC Connec-

tor, Back View

Advertising