Sensor3 Installation Checklist

35

A p p e n d i x B

Sensor3 Installation Checklist

Place a tick in each box to confirm item has been

checked and is OK. Write NA if Not Applicable.

Beforehand

All material on site. Advise ETC of shortages

ASAP.

Electrical Contractor wiring OK

Confirm time and personnel for training.

DMX

Belden 9729 and ETC specified cables.

Daisy chain DMX.

Termination DIPs set correctly

Measure DMX termination from far end

Ethernet

Network star topology and using CAT5 or

better cable

Longest ethernet Run < 100m

Cable correctly terminated

Rack - Power Off

Top/bottom access plates in place and air

gaps sealed

Side plates in place and air gaps sealed

All air gaps, connections to conduit, and

trunking sealed

All bolts tightened to specification

Rack bolted to floor or wall

Neutral per load, no floating neutrals/earths

in system

All load wires and lugs tight

Fan spins freely

Phase-Earth high impedance (>500k ohms)

Phase-Phase high impedance (>500k ohms)

Load-Neutral impedance > 1 ohm: no “shorts”

Rack clear of dust and debris

Dimmer modules: Chokes tight, hardware

tight, circuit breakers OK

Install dimmer modules

Install CEM3s

End User Training

Who received end-user training?

Contact ETC to return unused/defective

goods

Detail any open items

C A U T I O N :

This checklist is for use by authorised ETC trained personnel when energising

ETC Sensor3 racks. Do not attempt to energise a Sensor3 system unless you are

authorised and qualified to do so.