Regenerative brake sizing – Rockwell Automation 1336R REGEN LINE REG User Manual

Page 58

Advertising
background image

3–6

Regenerative Brake Operation

Regenerative Brake
Sizing

This is the peak current the 1336 REGEN Package can return
to the AC utility. For any regenerative application, the peak
AC current calculated in Step 8 (

I

1

), must be less than the peak

current calculated in Step 9 (

I

OL

). Because

I

1

is greater than the

rated current of the 1336 REGEN Package, the 1336 REGEN
Package will be operating at its overload region for some
portion of the application cycle.

The 1336 REGEN Package can operate for 1 minute at an
overload of 150% of rated current. At 140% of rated current,
overload time is approximately 77 seconds. Shown below are
the allowable operating times over a range of rated currents.

Figure 3.2 — 1336 REGEN Overload Rating

10. Calculate the overload current for your application (

I

PK

).

To calculate the overload current for your application (

I

PK

),

divide the peak AC current calculated in Step 8 (

I

1

) by the

rated current of the 1336 REGEN Package you plan to use.

I

PK

=

I

1

————
I

RATED

Where

I

RATED

= The nameplate current of the 1336 REGEN

Package

Remember

I

PK

must be less than 150% of the 1336 REGEN

Package you plan to use.

See page 3-8 for information on paralleling regenerative
brakes.

160

150

140

110

100

1

10

100

1000

10000

130

120

% of Rated Output Current (I

PK

)

Overload Time (Seconds)