120vac converter connections -18, 120vac precharge and converter wiring, D frame – Rockwell Automation 1336R REGEN LINE REG User Manual

Page 70: Converter, 3–18 regenerative brake operation, Risk of shock replace after servicing

Advertising
background image

3–18

Regenerative Brake Operation

120VAC Precharge and
Converter Wiring

120VAC Converter Connections

120VAC input and output power connections are made as shown
below.

Figure 3.10 —

120VAC D Frame Converter Connections

DANGER

DANGER

S2

TORQUE TERM. TO 6 N-m (52 lb-in)

T2

USE 75

°

C COPPER WIRE ONLY

R2

DC-

DC+

TE

PE

PE

120

RT

N

120

VA

C

!

DANGER

ELECTRICAL SHOCK HAZARD FROM
ENERGY STORAGE CAPACITORS
VERIFY LOW VOLTAGE DISCHARGE
BEFORE SERVICING.
SEE INSTRUCTION MANUAL.

! DANGER

RISK OF SHOCK
REPLACE AFTER
SERVICING

! DANGER

RISK OF SHOCK
REPLACE AFTER
SERVICING

CAT 1336R-VB180CNV-AN-HAP

SER A

119-150

AC INPUT

K V A

VOLTS

A

PH

HZ

AC OUTPUT

DC OUTPUT

REFER TO USER MANUAL FOR
INSTALLATION INSTRUCTIONS

180.4

3

50/60

380-480

144

196

735

ALLEN-BRADLEY

AB MADE IN U.S.A.

UL

®

LIST

ED 966X

IN D

C O N T E

Q

UL

®

LIST

ED 966X

IN D

C O N T E

Q

C

®

S2

TORQUE TERM. TO 6 N-m (52 lb-in)

T2

USE 75

°

C COPPER WIRE ONLY

R2

DC–

DC+

TE

PE

PE

120

RT

N

120

VA

C

120 RTN
(120V

AC COMMON)

120V

AC

(120V

AC)

t o p p e d

S

. 0 0 H z

0

+

➊ (2) jumpers connect PE and TE at the 1336 REGEN Converter Main Terminal Block.
Consult Allen-Bradley Application Engineering prior to removing either jumper.

D Frame

Converter

Advertising