Chapter 2: installation, Chapter objectives, Installing a 1203-gu6 module – Rockwell Automation 1336-GM6 Enhanced DeviceNet Communications Module User Manual

Page 21: Chapter 2, Installation, Chapter

Advertising
background image

Chapter

2

Installation

Chapter Objectives

Chapter 2 provides the information that you need to install the
1203-GU6 module or 1336-GM6 board. In this chapter, you will read
about the following:

Required tools and equipment.

Selecting cables.

Installing the adapter.

Removing the adapter.

How you install the adapter depends on whether you are installing a
1203-GU6 module or 1336-GM6 board. Refer to the following table
for information:

Installing a 1203-GU6 Module

Follow these procedures to install a 1203-GU6 module.

Required Tools and Equipment

To install your 1203-GU6 module, you will need the following tools
and equipment:

Enhanced DeviceNet communications module (1203-GU6).

Either a 5-pin or 10-pin plug-in connector (supplied with
module).

35 x 7.5 mm DIN rail A (Allen-Bradley part number 199-DR1;
46277-3; EN 50022).

1/8" flathead screwdriver.

Appropriate cables for SCANport and DeviceNet connections.
Refer to the “Selecting Cables” section in this chapter.

Selecting Cables

To connect the 1203-GU6 to the SCANport product and the
DeviceNet network, you must select an appropriate DeviceNet cable
and Allen-Bradley SCANport cable. Use the following information to
select appropriate cables for each connection.

If installing:

Then refer to:

1203-GU6 module

“Installing a 1203-GU6 Module” on page 1

1336-GM6 board

“Installing a 1336-GM6 Board” on page 6

Advertising