2 preparations – Metrohm 761 Compact IC User Manual

Page 64

Advertising
background image

3 Operating tutorial

761 Compact IC

54

3.2 Preparations

Before you start this brief tutorial, the entire IC system must be correctly

installed as described in section 2. In what follows, the most important

points for the installation are described once again (for details, see the

sections mentioned).

1 Install 761 Compact IC

Setting up instrument

section 2.2

Installing and connecting detector block

section 2.3.1

Mounting syringe and aspirating tubing

section 2.3.2

Mounting drain tubes

section 2.3.3/4

Mains connection

section 2.4

Connection to PC

section 2.5

2 Prepare eluent

Preparing eluent:

2 mmol/L NaHCO

3

/ 1.3 mmol/L Na

2

CO

3

in dist. H

2

O

Microfiltering and degassing eluent

section 5.1.3

3 Install high-pressure pump

Removing transport security screws

section 2.6.1

Mounting pulsation dampener

section 2.6.2

Installing eluent supply

section 2.6.3

Degassing pump

section 2.6.4

4 Connecting separating column and suppressor

Connecting IC anion column

section 2.7.8

Connecting peristaltic pump

section 2.8.2

Connecting supply bottles

section 2.8.3

Connecting suppressor module

section 2.8.4

Conditioning system

section 2.9.2

Advertising