In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

A P P E N D I X B
Locations Using 60 Hz Power (North America and Japan)

B-6

C

ONNECTING

THE

D

YNO

1

Turn off the main circuit breaker on the dyno. The main breaker is located in the
CPI door. Off is the down position.

2

Once you verify the voltages on the receptacle, connect the dyno to the
receptacle.

3

Connect the high pressure blowers to the dyno. For more information on
connecting the blowers, refer to your dyno installation guide.

4

Turn on the main dyno breaker.

5

Test the blowers for operation.

6

Turn on the dyno electronics and verify operation.

7

Test the control panel operations. For more information, refer to your dyno
installation guide.