Dynojet 250ix: Pit Installation Guide User Manual

Page 155

Advertising
background image

D Y N O P R E P A R A T I O N F O R U P G R A D E I N S T A L L A T I O N

Dyno Preparation

Version 3

In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

E-5

D

ISCONNECTING

THE

C

ABLE

T

RACK

AND

M

OVING

THE

C

ABLES

1

Remove the 1/4-20 screw securing the cable track bracket to the wheel clamp and
move the cable track aside. Replace this screw in the wheel clamp.

2

Remove the two 4-40 screws securing the wheel clamp cable track bracket to the
cable track.

3

Flip the wheel clamp cable track bracket over and secure to the cable track using
the two 4-40 screws removed earlier.

4

Remove the two 8-32 screws securing the cable track bracket to the junction box
and set aside.

5

Lift the cable track and the two cables and place on the left side of the tire
carriage.

6

Remove the two screws securing each blower connector to the junction box and
set aside.

7

Pick up the blower connectors and cables and move to the left side of the
carriage.
Note: Be sure to make note which is the left blower connector and which is the
right blower connector.

Figure E-4: Remove the Cable Track and Blower Connectors

junction box

cable track bracket

wheel clamp

wheel clamp cable

track bracket

blower connectors

Advertising
This manual is related to the following products: