Lining up and securing the module uprights – Dynojet 250ix: Pit Installation Guide User Manual

Page 38

Advertising
background image

In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

C H A P T E R 2
iPX Drum Module Installation

2-16

L

INING

UP

AND

S

ECURING

THE

M

ODULE

U

PRIGHTS

1

Verify the uprights on the drum and eddy current brake modules are flush with
the top of the pit floor before you tighten the connector plates.
1a

Loosen all upright bolts.

1b

Place two straight edges across the drum module uprights.

1c

With the upright tight against the straight edges and flush with the pit floor,
tighten the connector plate bolts and nuts on the drum module.

Note: You can use c-clamps to attach the upright to the straight edges to make
this quicker. Tighten the c-clamps until the uprights are flush with the pit floor.
1d

Tighten the upright bolts and nuts on the drum module.

1e

Repeat this for the eddy current brake module uprights.

2

Secure the starter brace to the starter using the washer and nut removed earlier.

3

Remove the straight edges.

Figure 2-9: Secure the Uprights

PD193

drum module

upright

eddy current brake

module upright

loosen bolts

securing
uprights

connector

plate bolts

Advertising
This manual is related to the following products: