Ipx drum module installation, Removing the items from crate – Dynojet 250ix: Pit Installation Guide User Manual

Page 34

Advertising
background image

In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

C H A P T E R 2
iPX Drum Module Installation

2-12

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

IPX DRUM MODULE INSTALLATION

When you receive your iPX upgrade kit, examine the exterior of the shipping
container for any visible damage. If damage is detected at this stage, contact the
shipper or Dynojet before proceeding with unpacking.
Use the following steps to unload the iPX drum module and related items. You will
need to provide equipment capable of lifting a minimum of 363 kg. (800 lb.) to move
the crated drum into position in your dyno room.

R

EMOVING

THE

I

TEMS

FROM

C

RATE

1

Move the crate to a clear area near your dyno room.

2

Using a pry bar, or a large flat screwdriver, and a hammer, carefully remove the
top and sides of the crate.

3

Remove the following parts from the crate and set aside.

part

description

part

description

drum guard mounting

bracket

P/N 21200025

pit cover, middle

P/N 61100005

drum safety cover

P/N 21200038

pit cover, right

P/N 61100006

cable track mounting

bracket (to trike carriage

adapter)

P/N 21200069

driveline assembly

P/N 62200004

drum guard (2)

P/N 21229106

drum module, pit

P/N 63200002

screw, 1/4-20 x 5/8",

pan-head, torx (12)

P/N 36561045

trike carriage adapter

assembly

P/N 71300002

Advertising
This manual is related to the following products: