JUNCTION BOX COVER, CABLE COVER, AND END CAP

Before installing the junction box cover, cable cover, and end cap be sure to route all
of your cables.
You will need the following parts:

• 21228519

Cable Channel End Cap

• 21228521

Junction Box Cover

• 21626902

Cable Cover, Pit to Junction Box

• 36540643

Screw, 8-32 x 3/8", Pan-Head, Phil (9)

1

Secure the junction box cover to the junction box using two 8-32 x 3/8-inch pan-
head screws.

2

Secure the end cap to the pit cover using two 8-32 x 3/8-inch pan-head screws.

3

Secure the cable cover to the end cap using four 8-32 x 3/8-inch pan-head screws.

4

Secure the cable cover to the junction box cover using one 8-32 x 3/8-inch pan-
head screw.
Note: Verify the cables are placed inside the cable cover.