Adjustable height side lite base - 4 1/2" deep, Fig. # 43, Fig. # 44 – EFCO 403 Series Storefront User Manual

Page 56: Fig. # 42, See fig. # 43 for 1" glazing, Vertical member prep for adjustable side lite base, See fig. # 42 for 1/4" glazing, Step 1), Side lite base head and sill prep, Step 2)

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 56 of 94

Series 401,402, & 403 Installation Instructions

7/

8

"

3/16"

7/8

"

#STT7

.125

Aluminum

2 15

/1

6

"

K354

9229

1 3/

16"

# 18 (.169 DIA.) DRILL
AT 1G14 ONLY
DO NOT DRILL MULLION

OVER.

W104 GASKET

(6) HOLES REQUIRED IF
BASE HEIGHT IS 24" OR

1/

4"

#STT7

K353

9129

See Fig. # 43 for 1" glazing.

1G13

Vertical member prep for adjustable side lite base.

Aluminum

.125

See Fig. # 42 for 1/4" glazing.

3/

4

"

2 1/

2"

EQUAL

EQUAL

BASE HEIG

H

T

=

4

1/2" MIN.

/ 48" MAX.

STEP 1)

1G13

7/8"

Fig. # 43

1/

4

"

7/8"

(#7 DRILL)

.201 DIA.

4 HOLES

3/8"

2 places 3" from ends

Sill prep only

Fig. # 44

7/8"

HORIZONTAL D.L.O.

Fig. # 42

Weep at sill of base unit.

Side lite base head and sill prep.

7/8"

1G13

1 3/

4"

STEP 2)

(.250 DIA.) 1/4" weep hole

1G13 prep at

sill of base unit.

1G13 prep at

head & sill

of base unit.

3/16"

1G13

SEAL EACH CORNER &
ACROSS THE BOTTOM

(4 OR 6 HOLES) TYP.

STK0 #8-18 X 3/4"
PL-PH-SMS 410 TEK/2

SECTION III: G. ADJUSTABLE HEIGHT

SIDE LITE BASE - 4 1/2" DEEP

1G14

1G14




























































Advertising
This manual is related to the following products: