Step 2) installation of glazing gasket, Fig. #105 – EFCO 403 Series Storefront User Manual

Page 88

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 88 of 94

Series 401,402, & 403 Installation Instructions






























































SECTION V:C. OUTSIDE GLAZING

Step 2) Installation of Glazing Gasket


For inside glazed applications, install the exterior gasket prior to glass installation. For
outside glazed applications, install the interior gasket prior to glass installation.

SIZE THE GASKET LENGTH BY USING THE FOLLOWING FORMULA.

D.L.O. DIM X 1.005 (D.L.O. DIM. + 1/2%)


NOTE: To install glazing gasket, start by pushing the gasket in place at the ends.
Move to the middle, then to quarter points and work the "waves" toward the ends. Do
not stretch the gasket or it will return to its original form, creating gaps at the gasket
intersection. (Gasket length=D.L.O. dim X 1.005. or D.L.O. dim + 1/2%)
See Figure 105 below.

Fig. #105

VERTICAL

JAMB GASKET

RUNS THRU
INSTALL FIRST

SEALANT

SEAL 1" VERTICALLY AND HORIZONTALLY IN THE

GASKET RACES WITH SILICONE TYPE SEALANT AT

ALL CORNERS. SEAL THE ENDS OF HORIZONTAL

GASKETS. CLEAN OFF ANY EXCESS SEALANT.

SEALING RACES AND GASKET ENDS IS REQUIRED AT
THE INTERIOR OF THE SYSTEM. EXTERIOR SEALANT

AT RACE AND GASKET IS OPTIONAL.

8" - 12"

VARIES

TYPICAL

JAMB

SILL

HEAD

VERT. GASKET

RUNS THRU

INSTALL FIRST

Advertising
This manual is related to the following products: