Door frame installation, Fig. # 51, Step 3) step 2) step 1) – EFCO 403 Series Storefront User Manual

Page 59: Step 4)

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 59 of 94

Series 401,402, & 403 Installation Instructions

Part # Y015

NOTE: If NO entrance frame is required, proceed to part "B"

NOTE: If an entrance frame is required, it must be installed first.

Anchor the door frame as indicated below in Fig. # 51 and also in

Set assembled door frame in opening, plumb and level.

Correctly locate the entrance frame in the opening.

SECTION IV: A. DOOR FRAME INSTALLATION

Door Installation Instructions

For bottom pivot prep see

K-153/K-154 Threshold Clip & Screws

@ Offset Pivots & Butt Hinges

@ Concealed Rod Panic

THRESHOLD

(9950)

Fig. # 51

Fig's. # 52 through Fig. # 56 on page 60.

floor and is cut longer
than any other vertical

The door jamb runs to the

member.

NOTE:

SIDE LITE SILL

STEP 3)

STEP 2)

STEP 1)

Continuous bead

of sealant

of this section.

K-124/K-125 Threshold Clip & Screws

Apply a bead of sealant around the interior portion of the jamb

STEP 4)

to set the member into. Then marry the side lite sealant or condition
sealant into the bead of sealant to be applied under the threshold.

The concept is to have a continuous bead of sealant at the interior,
connected from the sill flashing/condition through the door jamb
and continuing under the threshold to the opposite jamb and so on.






























































Advertising
This manual is related to the following products: