Fig. # 61, Fig. # 60, Step 2) – EFCO 403 Series Storefront User Manual

Page 62

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 62 of 94

Series 401,402, & 403 Installation Instructions

Splice the flashing every 20'-25' as shown in Fig. # 61. Use K-292 for

STEP 2)

For mitered corners, see page 63.

6" from vertical intermediates.

flashing. For best system performance, locate the splice joint

brake metal type flashing or K-293 for EFCO high performance

Fig. # 61

After the splice is in place, apply the cosmetic seal
to the interior gap vertically.

of sealant around the perimeter

Set sill flashing splice in a bed

of the splice.

bead of sealant is continuous.

over all screw heads.

# 9957 shown.

Anchor sill flashing
24" O.C. and seal

when in place to ensure the

Reapply sealant across the splice,

in the sill flashing.

silicone to fill the joint

Use backer rod and

3/8"

formed sleeve

.050 aluminum

K292 or K293

1" wide centered on splice.

Bond breaker tape

R.O

. - 3

/8"

SIL

L F

LA

SH

ING

Fig. # 60

BEAD OF

SEALANT

for # 9957

K449

K448

1G64, 1G65

& 1G85

End caps would be incorporated if the sill flashing could not be sealed to the

condition completely. An example would be, if the jamb condition was less than

the sill flashing depth or a void in the condition exist. This cut length provides a

3/16" gap between the sill flashing and condition for a good sealant joint when end
caps are not required.

SECTION IV: B. SILL FLASHING INSTALLATION






























































Advertising
This manual is related to the following products: