Series 401,402, & 403 Installation Instructions

F) Then, shift the glass into the deep pocket at the vertical.

outlined on page 87. Be sure to seal the gasket ends as described.

J) Snap-on the removable glass stop and install the interior glazing gasket as

I) Lower the glass onto the setting blocks.

G) Swing the opposite edge of the glass around to align with that glazing pocket.

H) Shift the glass into the shallow pocket until there is equal glass bite

on both edges of the glass.

Fig. # 109

H

F

I

C

G

E

J

D) Position the glass at the interior of the opening to be glazed.

Setting blocks are typically located at 1/4 points of the D.L.O.

C) Locate and position the glass setting blocks in the sill member's glazing pocket.

E) Lift the glass into the head member's glass pocket with the glass stop removed.

A) Cut the interior and exterior glazing gaskets to an approximate length of

B) Install the exterior glazing gasket by starting at one end and working toward the

center, firmly pushing the gasket into place. See page 89 for gasket installation.

DO NOT STRETCH THE GASKET OR IT WILL RETURN TO ITS ORIGINAL

FORM, CREATING GAPS AT THE GASKET INTERSECTIONS.

D.L.O. x 1.005 (DLO PLUS 1/2%).

SIDE. FOLLOW THE FABRICATION AND ASSEMBLY STEPS AS OUTLINED IN

WITH THE REMOVABLE GLASS STOP LOCATED AT THE HEAD ON THE INTERIOR

ALL SYSTEMS CAN BE INSIDE GLAZED. PREP AND ASSEMBLE THE FRAMES

STEP 1) GLASS INSTALLATION