Can system preparation / installation – EFCO 403 Series Storefront User Manual

Page 83

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 83 of 94

Series 401,402, & 403 Installation Instructions

S

S

S

S

Exterior and interior perimeter seals are mandatory with this can system.

condition with the end cap completely.

If end caps are incorporated, seal the can receptor cavity at the jamb

jamb, and set the jamb members into a bead of sealant in the sill receptor.

Apply a bead of sealant to the inside of the receptor to condition at the

center lines. Repeat the previous steps for multiple verticals.

Apply a small bead of sealant across the face of the verticals and jambs at the

can line connecting the bead of sealant from the filler track to the other side.

This is to ensure a continuous seal across the interior / exterior of the head

Snap-in the head and sill can fillers, locate the next verticals at the desired

CAN SYSTEM

PREPARATION / INSTALLATION

and sill can.

19)

20)

SECTION IV: F.

18)

17)

Fig. #98

Fig. #97

INTERIOR

JAMB

DETAIL SHOWN WITHOUT

END CAP

BED OF

SEALANT

CAN RECEPTOR

EXTERIOR

PERIMETER SEAL

SEAL INSIDE OF

CAN RECEPTOR

TO CONDITION

WHEN NOT USING

END CAPS.

CAN RECEPTOR

PERIMETER SEAL

CAN FILLER

APPLY A BEAD OF SEALANT TO THE INTERIOR

RECEIVING RACE FOR THE CAN FILLER PRIOR

TO INSTALLING THE FILLER. FILL THIS CAVITY

COMPLETELY TO ENSURE AN ADEQUATE

SEAL, CLEAN OFF ANY EXCESS.

SEAL ACROSS

ALL VERTICALS

CLEAN OFF EXCESS






























































Advertising
This manual is related to the following products: