Outside glazing, Step 3) glass installation fig. # 106 – EFCO 403 Series Storefront User Manual

Page 89

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 89 of 94

Series 401,402, & 403 Installation Instructions

STEP 3) GLASS INSTALLATION

Fig. # 106

C

A

B

F

E

D

B) Swing the opposite edge of the glass around to align with the glazing

F) Snap-on the removable glass stop, and install the glazing gasket.

then lower the glass onto the setting blocks.

E) Insert the setting blocks under the glass at the proper locations and

D) Lift the glass into the head member glass pocket.

C) Shift the glass into the shallow pocket until there is equal glass bite

refer to page 90.

See step # 1 on page 87.

If using antiwalk blocks,

NOTE:

on both edges of the glass.

pocket.

OUTSIDE GLAZING

(interior or exterior), and then shift the glass into the deep pocket.

A) Position the glass on the side of the framing with the removable stop

SECTION V: C.






























































Customer / Installer Note:

EFCO setting blocks are typically 4" in length with

different depths. If the glazing infill is "NOT BY EFCO"

and glazing sizes are larger than 40 square feet, then

the glazing details must be reviewed by the glazing

manufacturer for proper setting block size.

Advertising
This manual is related to the following products: