Intermediate horizontal - 4 1/2" deep, Fig. # 46, Fig. # 47 – EFCO 403 Series Storefront User Manual

Page 57: Fig. # 45, Step 1), Step 2)

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 57 of 94

Series 401,402, & 403 Installation Instructions

(6) HOLES REQUIRED

9129

36" IN LENGTH

C/L SYM.

7/

8

"

3/16"

3/16"

7/

8

"

9229

2 15

/16"

1 3/

16"

3/4"

#STT7

2 15

/1

6

"

K354

1G13

Aluminum

.125

7/8"

Fig. # 46

1 3/

16"

9229

1/

4

"

K353

#STT7

DO NOT DRILL MULLION

1G14 ONLY

# 18 (.169 DIA.) DRILL

7/8"

.125

1G13

7/8"

Aluminum

(6) HOLES REQUIRED IF

W104 GASKET

OVER.

BASE HEIGHT IS 24" OR

.201 DIA.

of unit.

head & sill

1G13 prep at

Fig. # 47

4 HOLES

AT HORIZONTALS OVER

(#7 DRILL)

9129

3/

4

"

STEP 1)

2 1/2"

EQ

U

AL

7/8"

STEP 2)

2 1/

2

"

EQ

U

A

L

HO

RIZ

O

NTA

L

HEIG

HT

= 4 1

/2" MI

N. /

4

8

" MAX.

Prep for intermediate horizontal head and sill member.

Fig. # 45

HORIZONTAL D.L.O.

See Fig. # 45 for 1/4" glazing.

Vertical member prep for adjustable intermediate horizontal.

See Fig. # 46 for 1" glazing.

1G14

SEAL EACH CORNER &

SEAL ACROSS BOTTOM

(4 OR 6 HOLES) TYP.

STK0 #8-18 X 3/4"
PL-PH-SMS 410 TEK/2

SECTION III: G. ADJUSTABLE HEIGHT

INTERMEDIATE HORIZONTAL - 4 1/2" DEEP

NOTE:

1G14





























































Advertising
This manual is related to the following products: