If error “11” or “71” is displayed, check the main gas solenoid

valve.

a.

# Disconnect the main gas solenoid valve (SV0)

connector and measure the resistance at the solenoid

terminals.

Normal: 1.7 ~ 2.1 K Ω

If normal, check b below.

Faulty: Replace gas valve.

(Service Procedure IGE-9, page 50)

b.

Measure voltage at the main gas solenoid (SV0)

Pink and black wires.

Normal: 80 ~ 100 VDC

If normal, proceed to check item 7 below.

Faulty: Replace PCB unit.

(Service Procedure IGE-2, page 47)

If error “11” or “71” is displayed, check the change over

solenoid (SV1).

a.

# Disconnect the change over solenoid (SV1)

connector, and measure resistance at the solenoid

terminals.

Normal: 1.7 ~ 2.1 K Ω

If normal, check b below.

Faulty: Replace the gas valve.

(Service Procedure IGE-9, page 50)

b.

Measure voltage at the change over solenoid

(SV1) yellow ~ black wires.

Normal: 80 ~ 100 VDC

If normal, check 8 below.

Faulty: Replace PCB unit.

(Service Procedure IGE-2, page 47)

If error “11” or “71” is displayed, check the change over

solenoid (SV2).

a.

# Disconnect the changeover solenoid (SV2) connector,

and measure the resistance at the solenoid terminals.

Normal: 1.7 – 2.1 K Ω If normal, check b below.

Faulty: Replace the gas valve.

(Service Procedure IGE-9, page 50)

b.

Measure the voltage at the changeover solenoid (SV2),

blue – black wires.

Normal: 80 – 100 VDC

If normal, check 9, on next page.

Faulty: Replace the PCB unit.

(Service Procedure IGE-2, page 47)

6) Is the main gas solenoid valve (SV0) operating normally?

7) Is the change over solenoid (SV1) operating normally?

8) Is the change over solenoid (SV2) operating normally?

VI - TROUBLESHOOTING

(cont.)

BEFORE CARRYING OUT CHECKS MARKED WITH A # SIGN, DISCONNECT THE POWER SUPPLY.