LAARS IGE-199C-5(N,X) - Service Manual User Manual

Page 46

Advertising
background image

VIII - SERVICE PROCEDURE

NOTE: Before proceeding with dismantling, be sure to follow the CAUTION

instructions before each explanation. Always disconnect the electrical supply, turn off water

and gas supply service valves, and drain all water from the unit before proceeding.

Only trained and qualified service agencies should attempt to repair this product.

Service Procedure

IGE - 1.

Removal of the Front Panel..........................................................47

IGE - 2.

Removal of the PC Board.............................................................47

IGE - 3.

Removal of the Water Flow Control and Sensor ..........................47

IGE - 4.

Removal of the Ignition Module...................................................48

IGE - 5.

Removal of the Combustion Fan ..................................................48

IGE - 6.

Removal of the Water Temperature Thermistor ..........................48

IGE - 7.

Removal of the Transformer.........................................................49

IGE - 8.

Removal of the Burner and Burner Manifold ...............................49

IGE - 9.

Removal of the Gas Valve Assembly ............................................50

IGE - 10. Removal of the Heat Exchanger Assembly ..................................50

IGE - 11.

Removal of the Thermal Fuse ......................................................51

Re-assembly in all tasks listed above in the reverse order of dismantling (unless stated otherwise.)

46

Advertising
This manual is related to the following products: