LAARS NeoTherm LC NTV1700 - Install and Operating Manual User Manual

Page 2

Advertising
background image

NeoTherm LC Boilers and Water Heaters

Section 1
General InformatIon ....................................... 1
1.1 Introduction ............................................... 1
1.2

about the touch Screen ........................... 1

1.3

Safety notes ............................................. 3

1.4

Model Identification / Nomenclature ......... 3

1.5 Warranty ................................................... 4
1.6

appliance overview .................................. 4

1.7

Dimensions ............................................... 6

1.8 Unpacking ................................................. 6

Section 2
locatInG the applIance .................................. 8
2.1

locating the appliance ............................. 8

2.2

correct Vent Distance

from Outside Wall or Roof Termination ..... 8

Section 3
VentInG anD combUStIon aIr ......................... 9
3.1

Combustion Air ......................................... 9

3.1.1 Combustion Air From Room ..................... 9
3.1.2 Ducted Combustion Air ........................... 10
3.2 Venting .....................................................11
3.2.1 Common Venting .....................................11
3.2.3 Venting Requirements Unique to Canada 11
3.3

Locating the Vent and Combustion Air

Terminals ................................................ 12

3.3.1 Side Wall Vent Terminal .......................... 12
3.3.2 Side Wall Combustion Air Terminal ......... 14
3.3.3 Vertical Vent Terminal ............................. 15
3.3.4 Vertical Combustion Air Terminal ............ 15
3.3.5 Installations in the Commonwealth of

massachusetts ........................................ 15

3.4

Common Vent Test ................................. 15

3.5

outdoor Installation ................................ 16

3.6

condensate trap .................................... 16


Section 4
GaS SUpply anD pIpInG ................................... 17
4.1

Gas Supply and piping ........................... 17

Distance & pipe Size, tables .................. 18

Section 5
pUmp reqUIrementS ....................................... 19
5.1

NeoTherm LC Boiler Flow and Head

Requirements ......................................... 20

5.2

NeoTherm LC Water Heater Flow and ......

Head Requirements ................................ 19

Section 6
Water connectIonS ....................................... 20

Section 6a - nth Systems ..................................... 20
6A.1

NTH System Piping: Hot Supply

connections ............................................ 20

6a.2

nth cold Water make-Up ...................... 20

6a.3

nth freeze protection ........................... 21

6A.4

NTH Suggested Piping Schematics ....... 21

6a.5

condensate trap .................................... 21

Section 6b - ntV Systems ..................................... 27
6b.1

ntV Water quality .................................. 27

6B.2

NTV Piping Requirements ...................... 27

6b.3

ntV cold Water make-Up ...................... 28

6b.4

ntV freeze protection ........................... 28

6B.5

NTV Suggested Piping Schematics ........ 28

6B.6

NTV Suggested Pumps .......................... 29

6b.7

condensate trap .................................... 29

Section 7
electrIcal connectIonS .............................. 30
7.1

main power ............................................. 30

7.2

Pump Connections ................................. 30

7.3

24 VAC Transformer with Integral

circuit breaker ........................................ 32

7.4

Signal connections ................................. 32

7.5

optional field connections .................... 32

7.6

Ladder Diagrams .................................... 33

Wiring Diagrams ..................................... 34


Section 8
USInG the toUch Screen anD GaUGeS...... 36
8.1

the touch Screen and Gauges on the front

of the NeoTherm LC ............................... 36

8.2

Using the touch Screen .......................... 36

8.3

While Operating – Checking Lead/Lag

Operating Information ............................. 38

8.4

Checking Lead/Lag Master ..................... 38

8.5

While operating - checking Individual

Parameters ............................................. 39

8.6

checking Individual Details .................... 40

8.7

Configuring Parameters on Individual

controllers .............................................. 40

8.8

Verification Process for Safety-Related

Parameters ............................................. 41

Table of Contents

i

Advertising