LAARS NeoTherm LC NTV1700 - Install and Operating Manual User Manual

Page 53

Advertising
background image

NeoTherm LC Boilers and Water Heaters

Page 49

15

Single

boiler

System

No

No

Yes

No

16

Single

boiler

System

No

No

Yes

Yes, from

system

17

Multiple

boiler

System

No

No

Yes

No

18

Multiple

boiler

System

No

No

Yes

Yes, from

system

19

Multiple

boiler

System

Yes

Yes

No

No

20

Multiple

boiler

System

Yes

Yes

No

Yes, from

system

21

Multiple

boiler

System

Yes

No

Yes

No

22

Multiple

boiler

System

Yes

No

Yes

Yes, from

system

Table 12 – Installations for Special Options (continued)

System 1 –

Single boiler, Local control

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 2 –

Single boiler, Local control, Outdoor reset

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 3 –

Multiple boilers, Local control

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Touch Screens that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system