Configuring Equipment For Delta or Wye Operation

WARNING: Voltage high enough to injure or kill persons exists in the Series 200 ACS rack when
power is applied. Verify that power has been removed from ACS rack before reconfiguring bus bars or
performing other internal work.

Determine requirements for either delta or wye load.

While operation as a delta load is typical in the U.S., most European countries require the system
to be configured as a wye load. For example, if the house service is a wye-connected source and
the phase-to-neutral voltage is 220, the system must be configured as a wye load.

Also note that if line voltage is 120 phase-to-neutral, the system must be configured as a delta load.
If line voltage is 220 phase-to-neutral, the system must be configured as a wye load.

In the Series 200 ACS rack, the system is configured by moving three bus bars. The mini-ACS rack
and Series 300 Modular Rack SixPack chassis use a switch. The SixPack chassis has a switch lock that
must be removed before the switch can be moved from one position to the other. This prevents
accidental switching.

Figure 1-6: Setting Delta/Wye Configuration in Series 200 and Series 300 Equipment

Type

VAC

Phase to

Neutral

VAC

Phase to

Phase

Delta/Wye

Jumper

Position

Voltage

to

Modules

Wye

100-130

175 - 225

Delta

175 - 225

Wye

180 - 240

310 - 415

Wye

180 - 240

Delta

-

180 - 240

Delta

180 - 240

Single Phase

180 - 240

-

Wye

180 - 240

Delta

Wye

Mini-ACS Rack

SixPack Chassis

Delta / Wye Switch

ACS Rack