PRG Controlling VARI-LITE Equipment Using DMX 512 User Manual

Page 95

Advertising
background image

S

YSTEM

: S

YSTEM

H

OOK

-U

P

0 2. 3 0 0 4. 0 3 00 . 5 4

87

3

Step 5. Configure Modular Rack.

Configure APS6 and/or C3 modules in SixPack chassis with regard to port assignments for
each Smart Repeater unit. In other words, if there is a VL6 luminaire connected to the first
output on a Smart Repeater unit, an APS6 module should be installed in the first slot of the
chassis connected to that Smart Repeater unit so that it receives power from an arc power
supply module.

Step 6. Configure SPC-36 controller.

If an SPC-36 controller is used to remotely start VL6 luminaire lamps or control C3
modules, it is normally installed into the topmost position of the modular rack. However, it
can be removed from the modular rack and installed elsewhere as long as it is still directly
connected to a SixPack chassis.

CAUTION: It is preferable to connect the SPC-36 controller’s S200 AC & DATA input to a SERIES
200 POWER OUT connector on modular rack’s breaker panel and not to a separate power source. This
prevents ground-loop problems when modular rack and SPC-36 controllers are on separate power
sources. DO NOT share separate grounds.

a. For APS6 modules, make sure that the PSET or DCV jumper is set to DCV mode for

correct wattage so that it can correctly respond to the SPC-36 controller. Refer to

"Configure APS6 modules. (There are two types of APS6 modules.)" on page 85

.

b. Attach the SPC-36 controller cables to each of the control inputs on the SixPack chassis

installed in the modular rack.

c. Set SPC-36 controller thumbwheel address. One SPC-36 controller can control up to 36

modules.

Step 7. Hang luminaires.

a. Determine hanging orientation of luminaires (refer to

"Luminaire Orientation and

Placement" on page 57

). Ensure the following:

1) Pipe for mounting luminaires is between 1 and 2 inches (25.40 to 50.80 mm) in

outer diameter.

2) The structure is secure and capable of supporting total luminaire load.
3) Sufficient clearance space is provided for each luminaire.

Port 6

Port 1

Advertising