3,1,5, installing the option board, Installing the option board – A&D Weighing Indicator AD-4329 User Manual

Page 9

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

3,1,5,

Installing the Option Board

Caution □ Do not remove screws without the following steps.

This is a procedure for the relay output board (OP-02).

Step 1 Remove the power cord and other cables from the indicator.

Remove four screws and four boits from the rear panel.

Remove two slide-rails, one on each sides.

Pull the rear panel and main board from the case. Then the connector between the

main board and the display board may be disconnected smoothly.

Remove two screws and the small blank panel from the rear panel.

Attach the option board using two screws.

Connect the option cable connector to J5 on the main board.

Insert the main board into the both main board guides and insert it as before. Then the

connector between the main board and the display board Is re-connected, if the rear

panel will not close completely, retry step 8 to insert the main board correctly.

Step 9 Attach both slide-rails. Fix the rear panel using four screws and four bolts as before.

Step 2

Step 3

Step 4

Step 5

Step 6

Step 7

Step 8

AD-4329 Weighing indicator

Page 7

3. Installation and Precaution

Advertising