System 2500 Operating & Installation Manual - Revision 07

4-4

Figure 23

Resolver Mounting Dimensions

4.2 Wiring

After the three major components of the System 2500 PLS have been mounted, the wiring of
these components may proceed. It is the responsibility of the installer to insure that the wiring
conforms to all applicable local codes. Wiring may be accomplished in the following order:

1.

Wire the OIT to the plug-in terminal strip provided for this purpose (terminals #1
through #8) as shown in Figure 24. The OIT terminal block may be accessed by
removing the rear cover plate of the OIT. An eight conductor shielded cable must
be used. If the OIT and the Logic Unit are not in the same enclosure, the cable
must be run through a dedicated conduit. The cable shield must be connected to
terminal #1 of the plug-in terminal strip. The shield on the OIT end of the cable is
not to be connected; it should be cut and taped so that it will be electrically