3 • operator functions – Pitney Bowes DI600 Inserting System User Manual

Page 34

Advertising
background image

3 • Operator Functions

3-4

SV40221 Rev. C

Loading Material

If feeders are NOT linked...

Load material into all the feeders as indicated by the Mail Piece Icon

Tree (refer to setting the feeders on pages 3-14 to 3-19).

If feeders ARE linked...
For Job Definitions which contain linked feeders, the loading of

the feeders must be in the correct order to minimize the risk of the

sheets becoming out of sequence.

Insert Feeders

The uppermost Insert Feeder (G) should be loaded first. The

Inserts should be loaded as instructed by the loading instructions

on the control panel. If OMR marks are used on the inserts, the

marks must be

face up and nearest to the front of the machine.

For C and Double folds

Place the complete stack of Sheets to be loaded into the Linked

Feeders

face up next to the machine. Select the required

amount of sheets to be loaded into the first Sheet Feeder. Load

the sheets as indicated by the loading instructions on the control

panel into the

uppermost linked Sheet Feeder. Take the next

required amount of sheets from the top of the stack and load

these into the feeder immediately below the previous feeder.

Repeat, if necessary, until all linked feeders are loaded.

For Sngle and Z folds

Place the complete stack of Sheets to be loaded into the Linked

Feeders

face down next to the machine. Select the required

amount sheets to be loaded into the first Sheet Feeder. Load

the sheets as indicated by the loading instructions on the control

panel into the

uppermost linked Sheet Feeder. Take the next

required amount for the top of the stack and load these into

the feeder immediately below the previous feeder. Repeat, if

necessary, until all linked feeders are loaded.

Advertising
This manual is related to the following products: