2.6 Site and Network Cable Preparation

2.6.1 Site Preparation

Prepare the site and associated equipment for operation of the MX/QX FF controlled MX/QX actuators
as follows:

1. Prepare a detailed site plan consisting of the following:

• Actuator locations and tag numbers
• Junction boxes and terminal strip locations and tag numbers
• Terminators and power supplies/conditioners, and repeaters
• Provide free access to the MX/QX control panel and terminal block for setup, configuration,

and troubleshooting.

T

FOUNDATION

Fieldbus

Interface

+

-

Fieldbus

Power

Supply

Shielded Wire Pair

T

Field

Device

Field

Device

Field

Device

T

FOUNDATION

Fieldbus

Interface

+

-

Fieldbus

Power

Supply

Shielded Wire Pair

Field Device

Field

Device

Field

Device

T