Warning, Installation, Top view front view left side view right side view – Montigo H36PVN User Manual

Page 5

Advertising
background image

H36PVN Power Vent Indoor Gas Fireplace

Page 5

XG0649 - 031511

Installation

Section 1: Installation Overview and Product Dimensions

Please review the Pre-Installation Checklist on Page 4

for general information on preparing for a successful

installation of your fireplace.
The H-Series H36PVN & fireplace
The H36PVN fireplaces may be installed in any location that

maintains proper clearances to air conditioning ducts, electrical

wiring and plumbing . Safety, as well as efficiency of operation,

must be considered when selecting the fireplace location . Try

to select a location that does not interfere with room traffic,

has adequate ventilation, and offers an accessible pathway for

Power Vent installation .
The fireplace dimensions are shown below:

Clearances

To ensure the H-Series H36PVN Fireplaces operate safely, all

models must maintain the following clearances .

*Note: Finishing hardwood, laminate flooring, or tile may be placed

directly in front of fireplace, however Montigo waives responsibility for

discoloration of flooring materials . Ability to withstand heat should be

discussed with the flooring manufacturer . If carpet is to laid there must

be a 12" clearance or hearth between the front of the fireplace and the

start of the carpet .

The H36PVN & H36PVL are power vented

fireplace systems. Under no circumstances can

these model(s) be installed without a power vent

module.

For regular Horizontal vent installation use 5"/8"

model EDVWSPV58 with the rough-in kit,

EDVWSPV58F for the

For regular Vertical vent installation use 5"/8"

model EDVRSPV58 with the rough-in kit, EPVF58

for the H36PVN & H36PVL.

WARNING

XW2022

Clearances to Combustibles

Model#

Top

Sides Back Floor

(under)

Floor

(front)*

H36PVN

8"

0"

1"

0"

0"

Figure 1. Fireplace dimensions.

23”

32”

8 3/4”

CL

8”

5”

41 ¼”

46”

2”

2”

¾”

9”

31 ½”

38 ½”

Nailing

Flange

Nailing

Flange

1”

5 ¾”

23”

Power Vent

Communication

Harness Port

Main Incoming A/C

Power Connection

Wht

Access Panel

Wall Switch

LVT Connection

10”

4”

Flexible Incoming

Gas Connection

Access

Panel

Blk

Top View

Front View

Left

Side View

Right

Side View

23”

32”

8 3/4”

CL

8”

5”

41 ¼”

46”

2”

2”

¾”

9”

31 ½”

38 ½”

Nailing

Flange

Nailing

Flange

1”

5 ¾”

23”

Power Vent

Communication

Harness Port

Main Incoming A/C

Power Connection

Wht

Access Panel

Wall Switch

LVT Connection

10”

4”

Flexible Incoming

Gas Connection

Access

Panel

Blk

Top View

Front View

Left

Side View

Right

Side View

Advertising