Before
commissioning

Filling the system

The system is filled on-site at the
filling and draining connection.

Anti-freeze protection for the medium

If a water-glycol mixture is used,
it is to be pre-mixed before being
put in the system. The desired con-
centration is then to be checked.

Unit preliminary pressure for the
medium

The preliminary pressure of the
medium (without operation of the
circulation pump) varies within
the system. From the highest
point, the pressure increases by
approx.10 kPa (0.1bar) per metre
difference in altitude (geodetic
altitude). The value measured at
the highest point is identified as
the standstill pressure.

The position of the unit in the
system is decisive in the calculation
of the unit's preliminary pressure
(pressure of the manometer on
the unit installed by the customer).
The pressure is to be set to at least
70 kPa (0.7 bar).

Bleeding the system

Air may still be in the pipe
lines after the leak test. This is
carried during operation of the
circulation pump to the next
highest point or to the cold
water drain. Here it is necessary
to vent again (Figure 10).

Also vent the pump if neces-
sary.

The standstill pressure must
then be adjusted to the re-
quired system pressure.

10 Manual bleeding

Manual
bleeder

MAG

The preliminary pressure for the
diaphragm expansion vessel must
be adjusted individually to the
system layout, the volume of the
medium and the installation site.

If the unit is positioned at the
lowest

point in the system,

the unit preliminary pressure
(=standstill pressure+geodetic
system altitude) must be set to
at least 70 kPa (0.7 bar) + 10
kPa (0.1bar) x geodetic system
altitude

.

If the unit is positioned at the
highest

point in the system,

the unit preliminary pressure
(=standstill pressure) must be
set to at least 70 kPa (0.7 bar).
Please note that the system
pressure at the lowest point
is increased by the geodetic
system altitude!

Leak testing

Leak testing is carried out after all
the pipes and fittings have been
connected.

1. Flush the system twice with

water.

2. Clean the sieve insert of the dirt

trap provided by customer.

3. Fill the system with water again

and vent the system at the
manual air bleeder.

4. Adjust the test pressure to

250 kPa (2.5 bar).

5. Check the connections after a pe-

riod of 24 hrs for leaking water.
If water is visible, the connection
has not been secured.
Tighten the connection or make a
new connection.

6. After a successful leak test, re-

move the excess pressure from
the medium line. If a water-
glycol mixture is used, adjust
the non circulating pressure as
required.

9 Unit preliminary pressure

Geodetic

System altitude

Unit preliminary

pressure

Unit preliminary

pressure

Non-circulating

pressure

REMKO KWL (H)