2-4 Installation

Rosemount Analytical Inc. A Division of Emerson Process Management

Model 3081FG

REFRACTORY

STACK OR DUCT

METAL WALL

WELD PIPE TO

METAL WALL

1.25 NPT

2 IN. NPT

SCHEDULE 40

PIPE

CUSTOMER

SUPPLIED
ADAPTER

29750004

2 IN. NPT

SCHEDULE 40

PIPE

SYSTEM

CABLE

STACK OR DUCT
METAL WALL

ADAPTER

INSULATE IF EXPOSED

TO AMBIENT WEATHER

CONDITIONS

REFERENCE

AIR LINE

CALIBRATION

CHECK

GAS LINE

2.0 IN. (51 mm)

MIN. DIA.

Figure 2-4. Horizontal Probe Installation

3. If the optional adapter plates are not

used, a 2 in. NPT, schedule 40, pipe
nipple (Figure 2-4) should be welded to
the stack or duct wall.

When a 2 in. NPT to 1.25 NPT adapter
is threaded to the welded pipe nipple,

the adapter provides the pipe threads
needed for the probe’s process fitting.

4. Where high particulate or slag is in the

flue gas stream, it may be desirable to
inset the probe in the refractory as
shown in Figure 2-5. Use pipe cou-
plings and nipples to adjust the probe
insertion depth.