Remote Processing RPC-210 User Manual

Page 59

Advertising
background image

TECHNICAL SPECIFICATIONS

SECTION 16

Page 16-2

between the battery and IC under it to keep the battery
from rocking. Bear in mind that the clock and RAM
draw micro-amps of current. Any conduction between
the + and - sides of the battery drains it. Be careful of
chemical adhesives as they may initially draw a lot of
current unit they cure.

Another way ar ound the batter y problem may be to
remov e B1 and solder leads to the battery holes.

Secure the settings for the reference and contrast pots R7
and R16. T hese pots are relatively open, so a high
viscosity fluid should be used.

MOUNTING TO A MOTHER BOARD

The RPC-210 can plug into a "mother board" which has
power, signal and other functions on it. F igure 15-1
shows pin 1 connector locations. Mother board
connectors are dual row, female, on a 0. 1" x 0. 1"
matrix, for 0.025" square posts. A table of
manufacturers and types are listed below.

Manufacturer

P/N and size

3M

929852E-01-26 26 position

3M

929852E-01-20 20 position

3M

929852E-01-10 10 position

A M P

2-1734508 26 position

Oupiin

204-126G S PC B mount, 26 pin

Oupiin

204-120G S PC B mount, 20 pin

Oupiin

204-110G S PC B mount, 10 pin

Samtec

SSM se ries (sur face mo unt)

Samtec

SSW, SSQ series (through hole)

Samtec

ESW, ESQ series (elevated)

Samtec connectors come in a variety of plating and
lengths. Contact them at 800-726-8329 for more
information.

M a x im u m co m po n en t h e ig h t i s 0 . 6 0" .

Remote Pr ocessing can, on special order and in quantity,
put connectors on the circuit side of the board.

Advertising