Installation – Hach sc1000 User Manual

Page 23

Advertising
background image

21

Installation

6. Strip the cable outer insulation 260 mm (10 in.) (

Figure 12

). Shorten all wires except

the earth wire 20 mm (0.78 in.), so the earth cable is 20 mm (0.78 in.) longer than the
other cables.

7. Feed the stripped power cable through the ferrite core twice (

Figure 12

) and wire into

the terminal as shown in

Table 1

and

Figure 10

. Tug gently after each insertion to

make sure that the connection is secure.

8. Seal any unused openings in the controller box with conduit opening sealing plugs.

9. Install the high voltage barrier.

10. Connect the chassis ground connection to the ground stud of the probe module

cover.

11. Install the probe module cover and screw into place.

Figure 12 Proper wire preparation and ferrite core wiring

1

Power cable wire preparation

3

Power cable wires

2

Ferrite core

4

Power cables wrapped around ferrite core

Table 1 AC power wiring information

Terminal number

Terminal description

Wire color code for North

America

Wire color code for Europe

L

Hot (L1)

Black

Brown

N

Neutral (N)

White

Blue

Protective Earth (PE)

Green

Green w/yellow tracer

Advertising