Figure 26, Table 9, Make sure t – Hach sc1000 User Manual

Page 38: Installation

Advertising
background image

36

Installation

After installation and connection of a plug-in expansion card, the card must be configured
to the system. For Profibus card setup instructions refer to

section 6.3.4.1 on page 109

.

Figure 26 Profibus DP card (YAB020) connections

1

Network termination activated, last device on network

3

Terminal Block – Refer to

Table 9

for terminal

assignments.

2

Network termination deactivated, other devices on network
after this device.

Table 9 Profibus DP card (YAB020) terminal assignments

Terminal

Designation

1

Not used

2

Not used

3

B in (wire color red)

4

A in (wire color green)

5

B out (wire color red)

6

A out (wire color green)

7

PE (Protective Earth)

Advertising