FUJITSU MHZ2250BJ User Manual

Page 63

Advertising
background image

4.4 Power-on Sequence

Start

Power-on

a)

Self-diagnosis 1

- MPU bus test

- Internal register

write/read test

- Work RAM write/read

test

The spindle motor starts.

Self-diagnosis 2

- Data buffer write/read

test

b)

Confirming spindle motor

speed

c)

Load the head assembly

Drive ready state

(command waiting state)

g)

Execute self-calibration

f)

Initial on-track and read

out of system information

e)

End

SATA I/F Initialization

d)

Figure 4.3 Power-on operation sequence

C141-E280

4-7

Advertising
This manual is related to the following products: