Site acceptance procedure – GE HC HP User Manual

Page 76

Advertising
background image

3-2

MDS Intrepid-HC HP Installation and Operation

Site Acceptance Procedure

The purpose of the following procedures is to verify that all installation requirements were noted and checked.
Following this procedure will ensure proper, long-lasting, and safe operation of the product.

The checklist below summarizes the installation requirements of the site.

SITE ACCEPTANCE CHECKLIST

1. SITE INFORMATION

Customer:

Radio model:

Site name:

Site code:

Radio link code:

Site address:

2. ANTENNA MOUNTING

Antenna mount type:

Mount is of sufficient height to clear local obstructions

OK

Mount is safely positioned to not cause a safety hazard

OK

Mount is secure and perpendicular

OK

Mount is grounded as per site specifications

OK

All steelwork is Galvanized or Stainless Steel as appropriate

OK

3. ANTENNA

Antenna type (model and size):

Antenna is securely fixed to mount

OK

Antenna is grounded as per site specifications

OK

Antenna sway braces are installed correctly (where
applicable)

OK

Antenna Radome is securely fitted (where applicable)

OK

Water drain plugs are fitted and removed, as appropriate

OK

Antenna sealing O-Ring is properly fitted and not damaged

OK

Antenna/Launch unit polarization is as per link requirements

OK

Advertising