Front view, One-line diagram – Liebert POWER PROTECTION STATIC TRANSFER SWITCH User Manual

Page 37

Advertising
background image

Installation Drawings

29

Figure 17 Electrical field connections drawing: 400 – 600 amp STS2 with dual output breakers

PS212401 Rev. 2

CB1

CB4

GROUND BUS

FRONT VIEW

RIGHT SIDE VIEW

NEUTRAL BUS

BUS

GROUND

PEM NUT

RIGHT SIDE VIEW

INPUT/OUTPUT BUS

.51 DIA.

NEUTRAL BUS

CB3

CB5

CB2

(WITH FRONT PANELS REMOVED)

FRONT VIEW

SYSTEM OUTPUT

Ø A, Ø B, Ø C

SOURCE 2 INPUT

Ø A, Ø B, Ø C

SOURCE 1 INPUT

Ø A, Ø B, Ø C

SIDE VIEW

SECTION A-A

SOURCE 1 INPUT Ø A

NEUTRAL BUS

PEM NUT

SOURCE 1 INPUT Ø B

SOURCE 1 INPUT Ø C

FRONT

SYSTEM OUTPUT

ONE-LINE DIAGRAM

K3
K2

CB4

K1

K3
K1

K2

CB5

SOURCE 1

CB1

CB2

SOURCE 2

CB3

A

CB3

CB3A

NOT RECOMMENDED.

NOTES:

1. ALL DIMENSIONS ARE IN INCHES AND (MILLIMETERS).

5.

ALL WIRING IS TO BE IN ACCORDANCE WITH NATIONAL

4.

ALUMINUM

AND

COPPER CLAD ALUMINUM CABLES AR

E

3. CONTROL WIRING AND POWER WIRING MUST BE RUN

2. TOP AND BOTTOM CABLE ENTRY AVAILABLE THROUGH

AND LOCAL ELECTRICAL CODES.

RUN IN A SEPARATE CONDUIT FROM INPUT CABLES.

IN SEPARATE CONDUIT. OUTPUT CABLES SHOULD BE

CONDUIT SIZE, AND REPLACE.

REMOVABLE ACCESS PLATES. REMOVE, PUNCH TO SUIT

NEUTRAL, AND GROUND CABLE CONNECTIONS. KIT

6. HARDWARE KIT IS SUPPLIED FOR INPUT, OUTPUT,

INCLUDES 1/2" BOLTS, WASHERS, AND NUTS FOR CONNECTING CABLES TO THE BUS BARS.

428 INCH-LBS. (48 N-m).

7. THE TORQUE REQUIREMENT FOR 1/2"-13 PEM NUTS IS

Advertising