To 19 for el, One-line diagram, Front view – Liebert POWER PROTECTION STATIC TRANSFER SWITCH User Manual

Page 39

Advertising
background image

Installation Drawings

31

Figure 19 Electrical field connections: 800 – 1000 amp STS2 with dual output breakers

PS212801 Rev. 2

ONE-LINE DIAGRAM

SYSTEM OUTPUT

SOURCE 1

CB4

K2

K3

K1

CB1

CB5

K2

K1

K3

SOURCE 2

CB2

CB3A

CB3

FRONT VIEW

(WITH FRONT PANELS REMOVED)

SIDE VIEW

SECTION A-A

NOT RECOMMENDED.

NOTES:

1. ALL DIMENSIONS ARE IN INCHES AND (MILLIMETERS).

5. ALL WIRING IS TO BE IN ACCORDANCE WITH NATIONAL

4. ALUMINUM AND COPPER CLAD ALUMINUM CABLES

AR

E

3. CONTROL WIRING AND POWER WIRING MUST BE RUN

2. TOP AND BOTTOM CABLE ENTRY AVAILABLE THROUGH

AND LOCAL ELECTRICAL CODES.

RUN IN A SEPARATE CONDUIT FROM INPUT CABLES.

IN SEPARATE CONDUIT. OUTPUT CABLES SHOULD BE

CONDUIT SIZE, AND REPLACE.

REMOVABLE ACCESS PLATES. REMOVE, PUNCH TO SUIT

NEUTRAL, AND GROUND CABLE CONNECTIONS. KIT

6. HARDWARE KIT IS SUPPLIED FOR INPUT, OUTPUT,

INCLUDES 1/2" BOLTS, WASHERS, AND NUTS FOR CONNECTING

CABLES TO THE BUS BARS.

428 INCH-LBS. (48 N-m).

7. THE TORQUE REQUIREMENT FOR 1/2"-13 PEM NUTS IS