Nortel Networks OPTera Metro 3500 User Manual

Page 183

Advertising
background image

Operation, administration, and maintenance (OAM) features 2-145

Planning and Ordering Guide—Part 1 of 2 NTRN10AN Rel 12.1 Standard Iss 1 Apr 2004

A STS-1 managed DS1 facility is cross connected to other endpoints in the NE
together with the other 27 DS1 facilities in one of the three facility groups on
the OC-3 card on the DSM by connecting the STS1 that corresponds to that
group of facilities.

Table 2-29 on page 2-145

provides the STS1 endpoints to

DS1 facility grouping assignments.

The STS-1 managed DSM will support the following STS-1 PM parameters:

Code Violation-Path (CV-P)

Errored Seconds-Path (ES-P)

Severely Errored Seconds-Path (SES-P)

AIS/LOP Seconds-Path (ALS-P)

Unavailable Seconds-Path (UAS-P)

Table 2-29
STS1 endpoints to DS1 facility grouping assignments

STS1 AID
Where <hslot> = 3 through 10
<hport> = 1 through 4

STS1 AID is used to perform BWM operations on the
group of DS1 facilities:

OC3-1-1-1-%HLINK-OC3-<hslot>-<hport>

in ports 1 through 28 of a DS1 DSM

OC3-1-1-2-%HLINK-OC3-<hslot>-<hport>

in ports 29 through 56 of a DS1 DSM

OC3-1-1-3-%HLINK-OC3-<hslot>-<hport>

in ports 57 through 84 of a DS1 DSM

Advertising
This manual is related to the following products: