Figure 2-8, Parallel operation –16 – Xantrex Technology XDI2048 User Manual

Page 36

Advertising
background image

Rack Mount Frame Assembly and Installation

2-16

TM-DIOP-01XN-01

The AC output load wires are also connected in parallel ensuring only
like terminals L1 and L2 are connected together at the distribution
bus or load. Each inverter output should be in series with a suitably
rated two pole circuit breaker before being terminated at the load.

Figure 2-8 Parallel Operation

L1
L2

1 2

6

3 5

7

4

1

4

7

5

3

6

2

1

4

7

5

3

6

2

L2

L1

L2

L1

Advertising