INSTALLATION

14

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

A. Cut openings in the bin floor for the Intermediate wells. (See figure below.) The number of wells

depends on bin size. The distance between Intermediate wells and the Centerwell should be equal.

3. INTERMEDIATE WELL INSTALLATION

36'

3

17' 10-7/8"

36.363''

53.75''

250.888''

36.013''

42'

4

20' 10-11/16"

32.613''

50.00''

286.638''

35.950''

48'

4

23' 10-1/2"

39.863''

57.25''

322.388''

35.888''

54'

4

26' 10-1/4"

47.113''

64.50''

358.388''

36.138''

60'

5

29' 10-1/8"

42.363''

59.75''

394.138''

36.013''

72'

6

35' 9-3/4"

44.113''

61.50''

465.638''

35.888''

75'

6

37' 3-5/8"

46.613''

64.00''

483.638''

36.013''

78'

6

38' 9-9/16"

49.113''

66.50''

501.638''

36.075''

DISTANCE

FROM CENTER

OF BIN TO

WALL (A)

NUMBER OF

INTERMEDIATE

WELLS

BIN SIZE

DISTANCE

FROM BIN

WALL TO

ANGLE RING

DISTANCE

FROM CENTER

OF BIN TO

ANGLE RING (D)

DISTANCE

BETWEEN

WELLS (C)

DISTANCE BETWEEN

CENTERWELL AND

FIRST INTERMEDIATE

WELL (B)

FIG. 3-A INT-WELLS

INTERMEDIATE WELL LOCATION AND CUT-OUT

FIG. 3-B SIDE VIEW DISTANCE